In Plittersdorf, the focus of village development is on the areas of the Rhine promenade, Ferry Road/Anchor Bridge, village center, Flower Road, southern entrance to the village and southern edge of the village. The redesign of the Rhine bank near the ferry landing stage has already begun and is scheduled for completion in the fall of 2023.
More info on the new Rhine promenade
Ferry road/Anchor bridge
The area around the anchor bridge is an important crossing point. Many people are on the move there, including cyclists on the PAMINA Rhine Cycle Route. An eye-catching pavement is to visually extend the Altrhein promenade on the flood protection embankment across Fährstraße. Also planned is a platform with seating that will provide an uninterrupted view of the Old Rhine. In addition, Fährstraße will receive improved lighting.
Village center
The town center is to be significantly upgraded. To this end, Schulstraße, Tullastraße, Blumenstraße and Fährstraße will be reduced to a minimum. Alternating with parking spaces, additional tree locations will be created.
The relocation of the kindergarten to the new building opposite the Altrheinhalle will free up the building previously used. Senior citizens will find a home there in the future.
The neighboring village square will be visually extended by a uniform road surface across the entire width of Tullastraße, which should lead to traffic calming. The same is planned for Fährstraße between the town hall square and the school. In addition, the parking lot at the Edeka market is to be expanded.
Flower Street
Six new detached houses are planned in the second row on Blumenstrasse. In this way, the residential development on the northeastern edge of Plittersdorf is to be carefully rounded off. The properties can be accessed via Blumenstrasse and Kleinwäldelestrasse.
Southern entrance to the town
The southern entrance to the village has already been redesigned with a traffic circle and crosswalk at the level of the Altrheinhalle. The new St. Raphael Catholic daycare center was also built there - a significant individual measure of the village development concept. More trees are to be planted along Riedstraße to give the entrance to the village an alley-like character. A playing field is also to be added to the adjacent sports field. The renovation of the clubhouse is also desirable.
Southern edge of the village
A new residential area and mixed and commercial areas are planned on the southern edge of the village. The first priority for commercial use is the area around the existing buildings of the Stoll company. Another commercial area is located on the street "Im Seefeld". In turn, a local supplier is to be located on Seefeldstrasse. In addition, the construction of single and double houses north of Fährstraße is planned to round off the southern edge of the village.
The planning for the fire department has changed. Contrary to initial considerations (as still shown on the plan), the location will be moved to the eastern edge of the town, and the traffic circle will be omitted. The new fire station will be built directly on Fährstraße.